Roadwork Postponed for 5&7 Pipe Replacement to Sunday

modotRoadwork that was scheduled for routes 5 and 7 in Greenview has been postponed due to weather. According to the Missouri Department of Transportation, the pipe replacement plan will continue starting on Sunday March 30th at 10pm and will continue until 7am Monday March 31st. Intermittent full closures of the roadway will occur during the construction process for up to 15 minutes at a time.

Contact KRMS

Local On Air: 573-302-7000
Business Phone: 573-348-2772
Fax: 573-348-2779

Mailing Address:
KRMS Radio
P.O. Box 225
Osage Beach, MO 65065

Physical Address:
5715 Osage Beach Parkway
Osage Beach, MO 65065

Leave a Reply