MoDOT was thrown off by the unexpected weather last week and, even if they did know it was coming, there wasn’t a whole lot they could’ve done at that point. That’s according to Central District Engineer Bob Lynch.
Lynch says they were able to put chemicals down to take care of the bridges, which were in decent shape, but it’s not physically possible to use those chemicals on every roadway.
Leave a Reply
You must be logged in to post a comment.